And So It Begins!
So I figured I'd begin with listing all the items I've got figured out so far. This will be the product backlog. Some of these items will definitely need breaking down, such as the individual swatches, and probably even the project ('cause it'll take a bit), but this is just the first go at the backlog anyway. I'm listing priorities and rough estimations of time, too. Priority Description Points 1000 Post on Ravelry asking about discrepancies with swatches/question numbers .5 950 Finish reformatting instructions 1 900 Wind all yarn for project, swatches, and test swatches .5 850 Find all books 3 800 Catalog books in Ravelry and also in a file in the format for the paper 2 750 Test knit "slingshot" long tail cast-on 1 700 Test bind off techniques to eliminate having a big stitch below last bound off stitch 1 650 Test knit a stockinette swatch to find gauge 1 600 Block test swatch .5 550 Measure test swatch .5 500 Type up cover letter .5 450 P...