Level 1 Sprint 1 Planning
I figure I may as well start sprinting, as it were, since I've been slowly doing stuff anyway, and this will help me be more organized about it. From my initial backlog I finished two items: Post on Ravelry asking about discrepancies with swatches/question numbers Finish reformatting instructions It turns out that I discovered a slight error in the instructions (for 3 swatches the wrong questions were listed) during my reformatting of the instructions. So now I can proceed knowing that I have the correct questions figured out for each swatch. Anyhow those two items are no longer in the product backlog, so I'll proceed with the next-highest priority items. The sprint goal is to finish gathering materials and finish prepping so that I'm ready to start knitting swatches. I think, since this is supposed to be fun and not work, that I shall not have an actual sprint length. It'll just be done when the items are done. The sprint backlog items are: Priority Descripti...